Schools and campuses

Make the infrastructure decision clear before asking suppliers to price it.

SafariCharge helps school leaders, facilities teams, advisers, and boards turn bills, bus schedules, site constraints, or an RFQ into one reviewable energy and EV charging decision.

Start with what you have. Missing evidence is recorded as a decision gate, not silently assumed.

What the school receives

A decision pack built for review, not a black-box answer.

Each output connects the recommendation to its source information, assumptions, limitations, and next action.

01

Campus baseline

Operating schedules, utility and fuel use, existing assets, constraints, and gaps in the available information.

02

Charging demand

Bus routes, battery capacity, dwell windows, charger use, and the effect of fleet growth on site demand.

03

Option comparison

Comparable solar, battery, grid, backup, and charging configurations with assumptions kept visible.

04

Investment case

Indicative cost, savings, resilience, trade-offs, and simple payback context for leadership review.

05

Procurement schedule

A structured equipment and service scope that makes supplier responses easier to compare.

06

Decision register

Warnings, approvals, evidence sources, professional review gates, and the reason the preferred option was selected.

How the work progresses

A visible path from brief to procurement.

The exact timing depends on site access, the completeness of records, stakeholder availability, and the professional studies required.

  1. 01

    Kickoff

    Confirm the decision, stakeholders, available records, and the questions the school must answer.

  2. 02

    Evidence review

    Organize bills, schedules, site information, fleet plans, quotations, and the RFQ. Record what is still missing.

  3. 03

    Options

    Model credible configurations and compare their technical, operational, and commercial implications.

  4. 04

    Decision pack

    Prepare a recommendation that leadership, finance, facilities, and advisers can review from the same evidence.

  5. 05

    Procurement handoff

    Translate the approved direction into supplier requirements, evaluation criteria, and professional design gates.

Procurement confidence

Make suppliers answer the questions that matter after installation.

A low equipment price is not the whole commercial offer. The procurement record should make safety, interoperability, warranty, support, training, and expansion commitments comparable.

Review all platform deliverables

Evidence boundary

What the platform supports, and what qualified professionals must verify.

SafariCharge supports

Planning and decision control

Structured inputs, option comparison, documented assumptions, investment context, procurement requirements, and an auditable decision record.

Professional verification

Site-specific engineering and delivery

Site surveys, network studies, protection design, stamped drawings, final equipment selection, installation, testing, and commissioning.

Start with the decision

Bring the campus brief, fleet plan, quotation, or RFQ.

We will structure what is known, identify the evidence gaps, and define the next credible step.

Request a school assessment